Staturday, 04/24/2021
Time A. | 04:48 AM | Time A Inspector | Dale Simmons | |
Time B. | 11:58 PM | Time B Inspector | Alonso De La Vega | |
Facility | Conditions | Time A | Time B | Remarks / Wk Order # | |
1. Pavement Areas | Pavement Lip over 3" | | Sat | | |
Hole 5" diam. x 3" deep | | Sat | | |
Cracks/Spalling/Bumps | | Sat | | |
Fod/Gravel/Debris | Sat | Sat | A= Picked up FOD on A2/A1/ | |
Rubber Deposits | | Sat | B=Excessive rubber deposits on Rwy 26/8. | |
Ponding/Edge Dams | Sat | Sat | | |
2. Safety Areas | Ruts/Humps/Erosion | | Sat | | |
Drainage/Construction | Sat | Sat | | |
Objects/Frangible bases | | Sat | | |
3. Markings & Signs | Visible/Standard | Sat | Sat | | |
Hold Lines/Signs | Sat | Sat | | |
rangible/Sign Damage | Sat | Sat | | |
4. Lighting | Obscured/Dirty/Faded | Sat | Sat | | |
Damaged/Missing | Sat | Sat | | |
Inoperative | Sat | Sat | | |
Adjustment | Sat | Sat | | |
5.Navigation Aids | Rotating Beacon | Sat | Sat | | |
Wind Indicators | Sat | Sat | | |
REIL/VASI systems | Sat | Sat | | |
Obstruction Lights | Sat | Sat | | |
7. Fueling Operations | Fencing/Gates/Signs | | Sat | | |
Fuel Marking/Labeling | | Sat | | |
Fire Extinguishers | | Sat | | |
Ground Clips | | Sat | | |
Fuel Leaks | | Sat | | |
Vegetation | | Sat | | |
8. ARFF | Equipment/Crew Avail | Sat | Sat | | |
Communications/Alarm | Sat | Sat | | |
9. Public Protection | Fencing/Gates | Sat | Sat | | |
Signs | | Sat | | |
10. Wildlife Hazards | Birds | Sat | Sat | A= 2 Birds | |
Animals | Sat | Sat | A= None | |
| | | | | |
|