| | Status | Task | | 1st Priority | |
2008 | Airside | Done | Built Pilot's Lounge | | $10,000 | |
2008 | Airside | Done | Generator for Fuel Farm |  | $6,000 |  |
2008 | Airside | Done | Move Customs Trailer | | $5,000 | |
2008 | Airside | Done | Paint GA Hangars |  | $1,000 |  |
2008 | Airside | Done | Shade over Vehicles | | $2,500 | |
2008 | Equipment | Done | Purchase Bobcat |  | $22,000 |  |
2008 | Equipment | Done | Upgrade Aircraft Handicap Ramp | | $6,500 | |
2008 | Landside | Done | Schematic Design Maintenance Hangar |  | $50,000 |  |
2008 | Security | Done | Replace 5 Computers | | $12,000 | |
2008 | Security | Done | Replace/Upgrade Existing Gate |  | $10,000 |  |
2008 | Security | Done | Upgrade Badging Camera System | | $7,000 | |
2008 | Security | Done | Upgrade Ops Furniture |  | $3,000 |  |
2008 | Terminal | Done | Beacon Display Case | | $7,400 | |
2008 | Terminal | Done | Big Digital Clocks |  | $1,500 |  |
2008 | Terminal | Done | Concrete Furniture | | $1,300 | |
2008 | Terminal | Done | Floor Scrubber |  | $4,900 |  |
2008 | Terminal | Done | Military Lounge Furniture | | $3,000 | |
2008 | Terminal | Done | Paint terminal walls inside |  | $15,000 |  |
2008 | Terminal | Done | Purchase Defribralators | | $2,000 | |
2008 | Terminal | Done | Re-Wire IT Cabling |  | $7,000 |  |
2008 | Terminal | Done | Remodel Event Center | | $6,650 | |
2008 | Terminal | Done | Replace AC Units - Phase 1 |  | $10,000 |  |
2008 | Terminal | Done | Upgrade Admin Furniture | | $25,000 | |
2008 | Terminal | Done | Upgrade Printers |  | $4,000 |  |
2008 | Terminal | Done | UPS systems Install/Replace | | $5,000 | |
2009 | Airside | Done | Install Tie Downs in T-Shades |  | $10,000 |  |
2009 | Airside | Done | Move FAA Trailer | | $5,000 | |
2009 | Airside | Done | Rehab Rolle Field |  | $80,000 |  |
2009 | Equipment | Done | Purchase verticle lift for inside terminal | | $13,000 | |
2009 | Landside | Done | Re-furbish SWF vacated buildings |  | $45,000 |  |
|