Yuma International Airport
Engineering Division
Environmental Background at the Airport




Vew Previous Item || View Next Item || Back to Complete List


Date Received
Category
Sub-Category
Document


12/07/2007
Airport
FedEx
The airport recently completed a Phase 1 on the DCC area which is available below. This was completed as part of the Taxiway F and DCC projects. To download the Phase 1 simply right click on the PDF icon and select the "Save Target As" menu option. This is a large file, over 58MB, and runs about 1,000 pages.
Phase I Environmental Assesment for YCAA Site.pdf


The airport currently has an Environmental Assessment in the Review Phase at the FAA awaiting their determination. This property is off the airport near the DCC area. The EA document is over 5MB and includes attachment 1. The Biological Evaluation document also includes Attachments 2 through 5 and is over 33MB. Please allow time for downloading.

Environmental Assessment BW.pdfBiological Evaluation.pdf


The Airport had a site evaluation completed on the DCC area 3 years ago in preparation for the departure of a tenant, to identify necessary remediation actions. All recommended actions were completed and are documented in the Phase 1 above. The Site Evaluation is over 16MB.
DCC Site Eval by Gilbertson.pdf




Vew Previous Item || View Next Item || Back to Complete List